CONSTRUCTION DETAILS

Please phone Chris Weir for advice on material sizes and spacings.

Phone 0356 278446

Step by step construction:

 

Step one:

Level ground work and step the site if required.

 

 

==========================================

Step two:

Place posts at correct position, center to suit engineers specifications for height of wall.  Make the posts a little longer than required and cut off after the wall is constructed.

eg:    1.2 height wall requires 1.2 meter centers of post in 150 X 150 sawn.

==========================================

Step three:

Level the first row and use galvanised bolts to fix this row in place.  It is critical that the first row is correctly placed.

==========================================

Step four:

When the first row is fixed off, place the next row in place with the joints staggered.  ie: Don't place joints from each row on top of each other.  (This would weaken the wall)

==========================================

 

 

Step five:

Place drainage if required.  It is advisable to construct the wall far enough away from the earth face the allow for screenings and drainage pipes to be easily placed .  It also gives you room to move around the wall.

 

 